Regardless of if you are in period 4 or period 8, we have paired the A and B days together so both days will be getting the same content. If you are not in class, you will be required to cover the content on your own OUTSIDE of scheduled build meetings with the mentors.
The build meetings with the mentors are meant to prove you understand the material provided in class (or on your own).
Week | Monday | Tuesday | Wednesday | Thursday | Friday | |
---|---|---|---|---|---|---|
Aug 16 | Basics | Hand Tools | ||||
Aug 23 | Band Saw + Drill Press | Hor. Band Saw | ||||
Aug 30 | Powder Coat | 3D Printers | ||||
Sept 6 | No School | OnShape Basics 1 | OnShape Basics 2 | |||
Sept 13 | Laguna: VCarve 1 | Laguna: VCarve 2 | ||||
Sept 20 | Laguna: Operation | Laguna: Fixturing | ||||
Sept 27 | Manufacturing Process | Valor Featurescripts | ||||
Oct 4 | CAD: Intro to FRC | CAD: Designing for FRC | ||||
Oct 11 | No School | Jira | ||||
Oct 18 | Flex | |||||
Oct 25 | Flex | |||||
Nov 1 | Flex | |||||
Nov 8 | Build Season Prep | |||||
Nov 15 | Build Season Prep |
Occur on Mondays and Wednesdays. Mondays are required for all students, Wednesdays are optional for those in class at least 2 days that week. Students who are not in class for both days that week need to attend the meeting on Wednesday.
Mentors will be there both days, students are welcome to come in even if it is optional.
Week | Monday | Wednesday | |||
---|---|---|---|---|---|
Sept 6 | No School | Practical: Hand Tools | |||
Sept 13 | Practical: Band Saw + Drill Press | Practical: Assembly | |||
Sept 20 | Practical: Laguna | Practical: Laguna | |||
Sept 27 | Practical: Laguna | Practical: Laguna | |||
Oct 4 | CAD Training 1 | CAD Training 2 | |||
Oct 11 | CAD Training 3 | Jira and Manufacturing Process | |||
Oct 18 | Flex | ||||
Oct 25 | Flex | ||||
Nov 1 | Flex | ||||
Nov 8 | Build Season Prep | ||||
Nov 15 | Build Season Prep |